Every remodel starts with demolition. Here is how to plan the tear-out so the rebuild starts clean, on time and without surprises.
A remodel is only as smooth as its first week. The tear-out sets the schedule for plumbers, electricians, framers and finishers, and anything found behind the walls changes the plan. Good demolition protects what stays, removes what goes and shows you what is hiding before the budget is locked.
We walk the space with you and your contractor, mark what stays, protect floors and the path out and remove finishes in a planned order. Utilities are coordinated with the right trades. If we find rot, old wiring or hazardous materials, we stop and show you, so decisions are made with facts and not in a rush.
What stays and what goes agreed in advance.
Floors, doors and the path out covered.
Shut-off and capping by the right trades.
Rot and old wiring shown to you early.
Dumpsters and hauling planned.
Open framing and a swept space.
Kitchen DemolitionCabinets, counters, appliances, flooring and walls taken out cleanly, so your remodeler starts with a clear, protected, ready-to-build…Explore
Bathroom DemolitionTubs, tile, vanities and fixtures removed with care in tight spaces, so the new bathroom starts on solid…Explore
Whole-Home Interior GutEvery room taken back to the studs and joists, with the structure protected and a clean, open shell…Explore
Drywall and Plaster RemovalOld drywall, plaster and lath removed from walls and ceilings with dust control, leaving clean studs and joists.Explore
Flooring and Tile RemovalCarpet, hardwood, vinyl, laminate and tile taken up cleanly, leaving a flat, prepared subfloor ready for new flooring.Explore
Ceiling and Popcorn CeilingTextured popcorn ceilings scraped and old ceilings removed, with plastic protection and a clean, smooth start for new…Explore
Cabinet and Countertop RemovalKitchen and bath cabinets, vanities and heavy stone or laminate counters detached and removed without damaging walls you…Explore
Wall and Opening DemolitionNon-load-bearing walls removed and new openings cut cleanly, with dust control and clean framing for an open, bright…Explore Plan your debris, check your readiness or ballpark a budget.
Demolition Debris and Dumpster CalculatorPick the project and size to see the debris in cubic yards, the tons and the dumpsters or truckloads to plan for.Try it
Demolition Readiness ChecklistCheck off the steps you have done to see how ready your project is and what to do next.Try it
Demolition Project Budget PlannerPick a project and a size and get a ballpark planning range.Try it Most kitchens and baths take one to two days, and whole-floor tear-outs take longer.
Yes. We mark what stays and protect it.
We stop, show you and talk through options before moving on.
Project situationTear-DownsOlder homes come down on tight Nashville lots every week. Here is what a smooth tear-down looks like…Learn more
Project situationDamaged StructuresFire, storm, flood and neglect can leave a building unsafe. Here is how to make a damaged structure…Learn more
Project situationBuilder SitesBuilders need clean, graded, well-documented lots on a firm schedule. Here is how demolition and site work support…Learn more
Project situationPools and BackyardsPools, patios, decks, fences and sheds all come out eventually. Here is how to reclaim a backyard without…Learn more Call us and we will walk the site and give you a clear plan and a written scope.