Why permits exist
Permits protect public safety, utilities and the environment. They also create a record that a building was removed and how.
Demolishing without one can mean fines and stop-work orders.
Commonly requested documents
Applications often ask for a site plan, proof of utility disconnects, a hazard survey, contractor information and sometimes erosion control plans.
We help you gather and organize them.
Utility sign-offs
Gas, electric, water and sewer disconnects usually need to be confirmed before a permit is issued. Start these early, since they can take weeks.
Written confirmation helps the permit move along.
Hazard surveys
Asbestos surveys are commonly required before demolition. Lead and other hazards may also matter.
Results may require abatement before demolition.
Inspections
Inspectors may check erosion controls, fencing, hazard clearance and the finished site. Preparing the site avoids re-inspections.
We meet inspectors when asked.
Always confirm locally
Rules differ among Nashville, Franklin, Murfreesboro and other communities, and they change. Your building department has the current requirements.
We explain what is typical and help you confirm the specifics.
Start permits, surveys and utility disconnects early, and confirm current local rules with your building department.