Partial and Addition Demolition in Nashville and Middle Tennessee
House & Structure Demo

Partial and Addition Demolition

Additions, sunrooms, wings and sections of a house removed while the rest of the home stays protected, weathertight and standing.

Partial demolition is delicate work. A rear addition, a sunroom, a wing or a collapsed section may need to come off while the rest of the house stays in use and safe. The new edge has to be supported, sealed and weathertight, and the cut line has to be clean.

We study how the addition connects to the main house: the roof tie-in, the shared walls, the floor framing and any wiring and plumbing that cross the joint. Then we shore where needed, cut along the planned line, take the addition down in sections and seal the exposed wall so the remaining home is protected from weather and pests until your builder finishes the work.

The connection line

The joint between old and new is the hardest part. We map roof, wall and floor connections and plan the cut so the main house is not weakened.

Support and weather protection

The exposed edge of the remaining house needs shoring, sheathing and a weather barrier. We install temporary protection the same day the cut is made.

Utilities across the joint

Wiring, plumbing and ducts often run into additions. We coordinate shut-off and capping with the right trades before cutting.

Planning the next step

If you are replacing the addition, we coordinate the foundation, framing and tie-in details with your builder or architect.

What is included

  • Review of the connection and utilities
  • Engineer or builder coordination as needed
  • Shoring and protection set-up
  • Section-by-section removal of the addition
  • Sealing and weatherproofing of the new edge
  • Hauling and cleanup
Before and after

See the transformation.

Drag the handle to compare.

After: a residential lot with a flat, clean, level lot of bare soilBefore: a residential lot with an old wood-frame houseBeforeAfter
Old house removed from the lot. From an old wood-frame house to a flat, clean, level lot of bare soil.
Why it works

What you get with Partial and Addition Demolition

Clean cut lines

Planned along the connection.

Shoring and support

The remaining house stays stable.

Weather protection

Exposed edges sealed the same day.

Utility coordination

Wiring and plumbing capped properly.

Builder coordination

Ready for the next phase.

Main house protected

Dust control and clean edges.

Try it now

Demolition Debris and Dumpster Calculator

Pick the project and size to see the debris in cubic yards, the tons and the dumpsters or truckloads to plan for.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about the project, the timeline and any concerns, and we set a time to visit that fits your day.

  2. 02

    Walk the site

    We walk the structure and the lot, check access, utilities and likely hazards and take photos and measurements.

  3. 03

    Plan, permit and protect

    We prepare the written scope, coordinate permits, surveys and utility disconnects and set up fencing and dust control.

  4. 04

    Demolish and sort

    The work proceeds in a planned order with water on dust and materials sorted for recycling.

  5. 05

    Haul and clean

    Debris is loaded and hauled away on schedule, and the site is swept and kept tidy.

  6. 06

    Grade and walk through

    We grade the lot, sweep for nails and debris, take photos and walk the finished work with you.

Questions

Partial and Addition Demolition FAQ

Can you remove an addition and keep the house?

Yes. We plan the cut, shore the connection and seal the exposed wall so the house stays protected.

Will the rest of the house be safe to live in?

Usually yes, once weather protection and utility capping are done. We tell you what is safe and what is not.

Do I need an engineer?

Often for structural connections. We coordinate with your engineer or builder when the cut touches structure.

How long does partial demolition take?

Small additions take a few days, and larger sections take longer. We give a schedule after the site visit.

Can you rebuild after demolition?

We focus on demolition and coordinate with your builder for the new construction.

Next step

Get your free Partial and Addition Demolition estimate.

Tell us about the project and we will call you back to talk it through.

Or call (615) 357-7797 to talk now.

Tell us about your project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate