
Cabinets, counters, appliances, flooring and walls taken out cleanly, so your remodeler starts with a clear, protected, ready-to-build space.
A kitchen remodel starts the day the old kitchen comes out, and that day sets the tone for the whole project. Cabinets are screwed, glued and nailed in, counters are heavy, tile is stubborn and plumbing and wiring hide behind every wall. Doing it right means removing what you want gone and protecting what you want to keep.
We walk the kitchen with you first and mark what stays and what goes. Then we cover floors and openings, shut off and cap what must be capped with your plumber and electrician, remove the cabinets, counters, backsplash and flooring in a planned order and haul everything out. The room is swept and left ready for framing, rough-in and new finishes.
Walk the room and decide up front about the floor, the walls, the ceiling and anything you want to save, such as a sink or a set of cabinets. A clear plan avoids damage to things you meant to keep.
Water, gas and electric lines must be shut off and handled by the right trade before demolition starts. We coordinate the timing with your plumber and electrician so nothing is cut live.
Dust travels. We hang plastic barriers, protect floors on the path out and keep the work area sealed from the rest of the house, so the remodel does not follow you into every room.
We leave the space swept, framing visible and the subfloor accessible, so your remodeler, plumber and electrician can start without cleaning up after us.
Drag the handle to compare.

BeforeAfterFloors and doorways covered along the route.
Shut-off and capping timed with your trades.
Cabinets, counters and tile taken out in order.
Everything loaded and removed from the site.
Barriers and cleanup keep dust in the work area.
Swept, open and easy for the next crew.
Every topic has its own page with what to expect and how we approach it.
Project situationRemodel PrepEvery remodel starts with demolition. Here is how to plan the tear-out so the rebuild starts clean, on…Learn more
Project situationOlder HomesOlder homes hide plaster, lath, old wiring and sometimes hazardous materials. Here is how to take them apart…Learn more
Project situationRental PropertiesInvestors and landlords need fast, fair, well-documented demolition to turn over, renovate or clear properties.Learn more Pick the project and size to see the debris in cubic yards, the tons and the dumpsters or truckloads to plan for.
You tell us about the project, the timeline and any concerns, and we set a time to visit that fits your day.
We walk the structure and the lot, check access, utilities and likely hazards and take photos and measurements.
We prepare the written scope, coordinate permits, surveys and utility disconnects and set up fencing and dust control.
The work proceeds in a planned order with water on dust and materials sorted for recycling.
Debris is loaded and hauled away on schedule, and the site is swept and kept tidy.
We grade the lot, sweep for nails and debris, take photos and walk the finished work with you.
Most kitchens take one to two days, depending on size, flooring and how many walls are involved. We give you a schedule at the walk-through.
You do not need to stay, but a quick walk-through at the start and a final look at the end helps. We keep you informed by phone or message.
Often, if they are in good shape. We can remove them carefully for reuse or donation when that fits your plan.
Gas and plumbing should be disconnected by the right qualified trade. We coordinate with them and demolish once the lines are safely capped.
Older flooring and adhesives can contain asbestos. If your home is older, we recommend testing before removal and we can coordinate it.
Cabinet and Countertop RemovalKitchen and bath cabinets, vanities and heavy stone or laminate counters detached and removed without damaging walls you…Explore
Flooring and Tile RemovalCarpet, hardwood, vinyl, laminate and tile taken up cleanly, leaving a flat, prepared subfloor ready for new flooring.Explore
Whole-Home Interior GutEvery room taken back to the studs and joists, with the structure protected and a clean, open shell…Explore
Debris Removal and HaulingDemolition debris, construction waste and cleanout material loaded, hauled and disposed of properly, so your project never stalls.Explore Tell us about the project and we will call you back to talk it through.
Or call (615) 357-7797 to talk now.