Cleared lots shaped to the right grade and slope, with drainage in mind and a stable pad ready for your builder.
After demolition, a lot is a blank slate, and the way it is shaped affects everything that follows. Grade determines how water flows, whether a foundation stays dry and whether a driveway meets the street at a sensible slope. Good grading prevents expensive problems later.
We review your survey, site plan and builder requirements, mark stakes and shape the lot with dozers and skid steers. We cut and fill where needed, compact the pad and set slopes away from the house. We add stone entrances and silt controls where the project calls for them, and we leave a clean, stable site that is ready to stake out.
We follow the survey and site plan, and we coordinate with the surveyor or builder on target elevations.
Water has to move away from the structure and off the lot without flooding neighbors. We set slopes and swales to match the plan.
Fill must be placed and compacted in layers, or the pad will settle. We use the right equipment and verify as the project requires.
A stone construction entrance and silt fence keep mud off the street and soil on the lot.
Drag the handle to compare.

BeforeAfterSurvey and builder targets followed.
Slopes and swales set correctly.
Placed in layers for a stable pad.
Stone and silt controls.
Elevations agreed in advance.
Ready to stake out.
Every topic has its own page with what to expect and how we approach it.
Project situationBuilder SitesBuilders need clean, graded, well-documented lots on a firm schedule. Here is how demolition and site work support…Learn more
Project situationTear-DownsOlder homes come down on tight Nashville lots every week. Here is what a smooth tear-down looks like…Learn more
Project situationPools and BackyardsPools, patios, decks, fences and sheds all come out eventually. Here is how to reclaim a backyard without…Learn more Pick the project and size to see the debris in cubic yards, the tons and the dumpsters or truckloads to plan for.
You tell us about the project, the timeline and any concerns, and we set a time to visit that fits your day.
We walk the structure and the lot, check access, utilities and likely hazards and take photos and measurements.
We prepare the written scope, coordinate permits, surveys and utility disconnects and set up fencing and dust control.
The work proceeds in a planned order with water on dust and materials sorted for recycling.
Debris is loaded and hauled away on schedule, and the site is swept and kept tidy.
We grade the lot, sweep for nails and debris, take photos and walk the finished work with you.
Yes. We work from the survey and the builder elevations.
Yes, when the plan calls for it. We coordinate delivery and compaction.
We can regrade and add swales and flag problems that need an engineer or drainage contractor.
We can coordinate testing with a qualified firm when your plans require it.
Most residential lots take a few days.
Backfill and CompactionFoundation voids, pool shells and trenches filled with the right material and compacted in layers for a stable…Explore
Site Clearing and Land ClearingBrush, trees, stumps, fences and debris cleared from lots and acreage, with usable areas shaped and the cleared…Explore
Erosion and Sediment ControlSilt fence, straw wattles, stone entrances and seeding that keep soil on your lot and out of storm…Explore
Post-Demolition CleanupThe final sweep, rake and grade that leaves a clean, level site with no nails, glass, wire or…Explore Tell us about the project and we will call you back to talk it through.