Partitions, ceiling grids, carpet and cabling removed from offices and suites, ready for a tenant improvement build.
A tenant improvement begins with demolition. Cubicles, partition walls, dropped ceilings, carpet and old cabling have to come out of a suite without disturbing the tenant next door or the landlord systems above the ceiling.
We review the lease space and the build-out drawings and mark what is to remain. We protect elevators, lobbies and hallways, work after hours when requested and remove partitions, ceiling grids, tiles, flooring and wall coverings in order. Low-voltage and electrical work is coordinated with the right trades, and the suite is left clean, with the structure and mechanical systems exposed and protected for the next contractor. We keep a short daily update for your project manager, covering what came out, what was found above the ceiling and what comes next. Clear, steady communication helps your designer and general contractor stay ahead of the schedule.
Landlords have rules on hours, elevators, dumpsters and insurance. We coordinate with building management so the project follows them.
Metal stud partitions, drywall and acoustic ceilings come down quickly, but ceiling tile dust and drywall dust need controls in occupied buildings.
Old data and power cabling often hides in the ceiling and walls. The right trades should disconnect it and we remove what is abandoned.
Tenant improvements run on lease dates. We plan crews and hauling to meet your move-in plan.
Drag the handle to compare.

BeforeAfterPartitions, ceilings and flooring.
Hours, elevators and dumpsters planned.
Protection for neighbors and common areas.
Abandoned wiring removed with the right trades.
Built around your move-in date.
A clean, open suite.
Every topic has its own page with what to expect and how we approach it.
Project situationCommercial Build-OutsA new tenant means a new space. Here is how commercial demolition prepares restaurants, shops and offices for…Learn more
Project situationRemodel PrepEvery remodel starts with demolition. Here is how to plan the tear-out so the rebuild starts clean, on…Learn more
Project situationRental PropertiesInvestors and landlords need fast, fair, well-documented demolition to turn over, renovate or clear properties.Learn more Pick the project and size to see the debris in cubic yards, the tons and the dumpsters or truckloads to plan for.
You tell us about the project, the timeline and any concerns, and we set a time to visit that fits your day.
We walk the structure and the lot, check access, utilities and likely hazards and take photos and measurements.
We prepare the written scope, coordinate permits, surveys and utility disconnects and set up fencing and dust control.
The work proceeds in a planned order with water on dust and materials sorted for recycling.
Debris is loaded and hauled away on schedule, and the site is swept and kept tidy.
We grade the lot, sweep for nails and debris, take photos and walk the finished work with you.
Yes. We schedule to meet your building rules and lease deadlines.
Yes, along with partitions, doors and wall coverings.
Yes. We follow building rules and coordinate access and dumpsters.
Most suites take a few days to a week, depending on size.
Yes. We leave it swept and ready for the next contractor.
Commercial Interior Strip-OutCeilings, partitions, flooring, fixtures and systems removed from commercial interiors, leaving a clean shell for the next tenant.Explore
Selective Demolition for RenovationPrecise removal of specific walls, floors, ceilings and systems while the rest of the building stays protected and…Explore
Restaurant and Retail DemolitionKitchens, hoods, bars, booths, shelving and storefronts removed from restaurants and shops, leaving a clean space for the…Explore
Dust, Noise and Neighbor ProtectionWater, fencing, barriers, planned hours and clear communication that keep demolition from becoming a problem for the people…Explore Tell us about the project and we will call you back to talk it through.
Or call (615) 357-7797 to talk now.